Prime contracts live in SharePoint. MEP coordination drawings and specs live in Procore. Subagreements and executed change orders sit in separate folders that are easy to miss during drawing review.
Those project files sit in separate systems. Project teams struggle to cross-check what contracts assign against what coordination drawings show. Scope gaps between drawings, specifications, and subcontract scope turn into trade disputes. By the time those gaps surface through RFIs or subcontractor protests during mobilization, the options are change orders, contingency draws, or both.